RTA Approval Consultant in Dubai

Compliance & Documentation Matrix

A complete breakdown of RTA Authority regulations. Find mandatory documents, submission fees, and NOC procedures for Commercial, Residential, and Industrial fit-out permits in Dubai.

Scroll right to view all property types →
RTA approval is mandatory for construction, development, and infrastructure projects in Dubai that impact roads, traffic flow, parking, or access points. This includes residential buildings, commercial developments, warehouses, and mixed-use projects. RTA approval ensures that your project complies with Dubai’s road safety, traffic management, and transportation regulations. Our RTA approval consultants in Dubai manage the complete approval process, including traffic impact studies (TIS), road access approvals, parking layout approvals, and coordination with the Roads and Transport Authority. We prepare and submit all required drawings, reports, and documents to ensure smooth and timely approvals. With strong experience in RTA approvals for residential and commercial projects, we help you avoid delays, reduce revisions, and achieve full regulatory compliance for your project in Dubai.
Detailed table showing RTA Authority requirements, documents, and NOC status for various property types in Dubai.
Approval RequirementRestaurant UnitSalon / PolyclinicOffice Fit-outRetail / ShopIndustrial WarehouseVilla (New Build)Villa ModificationSwimming PoolHotel / HospitalityExt. Signage
External Seating Permit (Restaurants & Cafés)Outdoor tables & chairs on pavement / sidewalkTrade license, Ejari, Building Management NOC, Restaurant layout approvalSite plan showing pavement width, seating layout, pedestrian clearanceRTA ROW Permit PortalMust maintain minimum pedestrian clear path; often linked with Dubai Municipality approval
Signage affecting road corridor, poles, bridges, ROWSignage affecting road corridor, poles, bridges, ROWTrade license, landlord NOC, advertisement detailsLocation map, sign design, dimensions, fixing/structural detailsRTA Advertising ServicesIf sign is on building façade only, DM signage approval applies instead
Private Paid Parking Plot Access PermitParking inside empty plot with access from public roadPlot ownership documents, authorization letter, application formParking layout, entry/exit geometry, access driveway drawingsRTA Services PortalApproval depends on road classification and traffic impact
RTA eNOC – Road Corridor / Infrastructure WorksExcavation, trenching, utility crossings near roadsNOC application, route NOC, contractor detailsKey plan, location plan, method statement, traffic plan (if required)RTA eNOC Portal (noc.rta.ae)Separate eNOC required for each location/segment
Temporary Traffic Management / Road Diversion PermitLane closure or diversion due to construction worksApproved consultant & contractor, TMP submissionTraffic Management Plan, diversion drawings, signage planRTA ROW / eNOCMore stringent for major roads and longer durations
Road Closure Permit for EventsMarathons, events, public gatheringsEvent details, safety & security planRoad closure plan, detour routes, marshal planRTA ServicesRequires early submission and coordination with Police
ROW Utilization Permit (Temporary Use)Hoarding, temporary access, construction near roadContractor details, scope description, feesROW usage layout, hoarding & access drawingsRTA ROW Permit PortalCommon for projects adjacent to road boundary

Status Legend

Required

Mandatory document for approval

If Applicable

Dependent on project scope

Not Required

Exempt for this category