Why JAFZA Approvals Get Rejected, and How to Fix Each Cause
JAFZA works are approved by Trakhees, through its engineering and EHS departments. Most refusals trace back to six causes, and nearly all of them are decided before the first drawing is sent.
Dar Al Naseeb Engineering Consultants
Licensed Engineering Consultants · Dubai, UAE · Est. 2012
The Six Causes
1. Drawings in Dubai Municipality format. Trakhees uses its own format, and DM-format drawings are routinely rejected.
2. Racking installed before approval. Structural racking needs approval first. See racking approval.
3. Mezzanines without structural and fire updates. See mezzanine approval.
4. EHS left until after the building permit. Operational requirements affect layout, so plan them together. See JAFZA EHS.
5. Dangerous goods not declared at design stage, which changes fire and storage requirements.
6. Unaccredited staff on the submission. Companies with projects under Trakhees must follow its accreditation requirements. See Trakhees accreditation.
Next Steps
For the full process, see JAFZA warehouse approval. When leaving a unit, see JAFZA vacating and handover.
Free Assessment
JAFZA Application Came Back?
We fix the format, sequence and documentation, and resubmit once. Free review in 24 hours.
Frequently Asked Questions
01Why was my JAFZA application rejected?
02Who approves works in JAFZA?
03Can I install racking in a JAFZA warehouse before approval?
Official Sources
Fees and procedures change without notice. Confirm any figure with the authority before you rely on it.