Approved Project Portfolio

Projects Approved Across Every Dubai Authority

Villa extensions, warehouse mezzanines, restaurant and clinic fit-outs, Change of Use — grouped by the authority that approved them, because that is what determines the drawings, the fees and the timeline. 1,500+ permits secured with a 98% first-pass approval rate.

Nakheel master communities and the port free zones, reviewed by the Trakhees Civil Engineering Department. A developer NOC is required before Trakhees will accept the submission. See the approval service

By Location

View all Trakhees Approved Projects

Dubai Development Authority zones, submitted in DDA Circular 400 drawing format through the DDA portal rather than DM BPS. See the approval service

By Location

View all DDA Approved Projects
FAQ

About These Projects

Which authority approved these projects?

It depends on the plot. Mainland Dubai projects are approved by Dubai Municipality through the BPS portal. Projects in Nakheel master communities and the port free zones go through Trakhees PCFC. Projects in Dubai Development Authority zones follow DDA Circular 400 format through the DDA portal. The three groups below are split on exactly that basis.

Do you handle both the design and the approval?

Yes. We are a licensed engineering consultant, so drawings are produced in-house to the submitting authority's format rather than being redrawn from a third-party design. That is what keeps the first-pass approval rate high — most rejections are drawing-format and compliance issues, not design issues.

How long does a typical approval take?

Residential DM permits typically run 3 to 5 working days, DDA 7 to 14, and Trakhees 5 to 20, once a complete submission is accepted. The variable that dominates most programmes is not the authority's review time but the developer or building-management NOC that has to be in place first — that step can add two to three weeks in master-developer communities.

Planning something similar?

Tell us the plot or unit and the scope. We confirm the governing authority, the NOCs required and a realistic programme — free, within 24 hours.