Why Dubai Municipality Approvals Get Rejected, and How to Fix Each
Dubai Municipality publishes 3 working days for a new building permit. When a permit takes weeks, the cause is nearly always in the submission. Here are the seven we see most, with the fix for each.
Dar Al Naseeb Engineering Consultants
Licensed Engineering Consultants · Dubai, UAE · Est. 2012
The Seven Causes
1. Drawing format. Layers and file formats that don't meet the Dubai Building Code standard fail the BPS check. See how BPS works.
2. Al Sa'fat gaps. Sustainability requirements missing or incomplete. See Al Sa'fat 2.0.
3. Developer NOC missing in a master community.
4. Affection plan problems: outdated, or a design that exceeds its limits. See affection plans.
5. Wrong permit type, such as a decoration or fit-out route for structural work.
6. Structural information missing for wall removals, mezzanines or additions.
7. Consultant or contractor changes not processed. DM has separate services to change them before and after the permit is issued.
Resubmitting
Answer every comment in one resubmission. If the project stalled before the permit was issued, DM also offers a service to extend the validity of engineering drawings. See DM application status and the DM approval checklist.
Free Assessment
DM Permit Came Back?
We review the comments, fix the drawings and resubmit through BPS once. Free review in 24 hours.
Frequently Asked Questions
01Why was my Dubai Municipality permit rejected?
02How long should a Dubai Municipality building permit take?
03Can I change my consultant during a DM application?
Official Sources
Fees and procedures change without notice. Confirm any figure with the authority before you rely on it.