Dubai Municipality·5 min read·

Why Dubai Municipality Approvals Get Rejected, and How to Fix Each

Drawing FormatAl Sa'fatNOCsAffection PlanPermit TypeConsultant Changes

Dubai Municipality publishes 3 working days for a new building permit. When a permit takes weeks, the cause is nearly always in the submission. Here are the seven we see most, with the fix for each.

Dar Al Naseeb Engineering Consultants

Licensed Engineering Consultants · Dubai, UAE · Est. 2012

3 days
DM's published new building permit time
BPS
Where submissions are checked
7 causes
Behind most returned files
3 days
DM's published new building permit time
BPS
Where submissions are checked
7 causes
Behind most returned files
Registered
Consultants only can submit
Dubai Municipality permits are submitted through its Building Permit System (BPS) by registered consultants. Drawings are checked for format and compliance before technical review, so many problems show up at the first gate.
01

The Seven Causes

1. Drawing format. Layers and file formats that don't meet the Dubai Building Code standard fail the BPS check. See how BPS works.

2. Al Sa'fat gaps. Sustainability requirements missing or incomplete. See Al Sa'fat 2.0.

3. Developer NOC missing in a master community.

4. Affection plan problems: outdated, or a design that exceeds its limits. See affection plans.

5. Wrong permit type, such as a decoration or fit-out route for structural work.

6. Structural information missing for wall removals, mezzanines or additions.

7. Consultant or contractor changes not processed. DM has separate services to change them before and after the permit is issued.

02

Resubmitting

Answer every comment in one resubmission. If the project stalled before the permit was issued, DM also offers a service to extend the validity of engineering drawings. See DM application status and the DM approval checklist.

Free Assessment

DM Permit Came Back?

We review the comments, fix the drawings and resubmit through BPS once. Free review in 24 hours.

Frequently Asked Questions

01Why was my Dubai Municipality permit rejected?
Most often because of drawing format, incomplete Al Sa'fat sustainability information, a missing developer NOC, affection plan issues, the wrong permit type or missing structural information.
02How long should a Dubai Municipality building permit take?
DM publishes 3 working days for a new building permit and demarcation certificate once the submission is complete.
03Can I change my consultant during a DM application?
Yes. Dubai Municipality has separate services to change a consultant before the permit is issued and a contractor or consultant after it.