DDA Documents by Permit Type: The Official Lists Side by Side
DDA publishes a separate document list for each permit. Using the fit-out list for a modification, or missing one NOC, is how applications stall. Here are DDA's own lists, side by side.
Dar Al Naseeb Engineering Consultants
Licensed Engineering Consultants · Dubai, UAE · Est. 2012
Plus AED 10 Knowledge Dirham and AED 10 Innovation Dirham per transaction.
| Permit | Fee | Service time |
|---|---|---|
| Fit-Out Permit | AED 0.90/ft², min 200, max 10,000 | 2 working days |
| Building Modification Permit | AED 1.0/ft² of relevant area | 2 working days |
| Shoring Permit | AED 0.05/ft² of total BUA | 3 working days |
| Demolition Permit | AED 1,000 per unit per floor | 5 working days |
Fit-Out Permit
- Contractor appointment letter from the tenant
- Copy of Ejari
- NOC from the building owner
- NOCs from relevant authorities, per DDA's NOC matrix
- Approved stamped drawings and proposed drawings, in Circular 400 format
Where the building has no completion certificate yet, DDA also requires NOCs from the main contractor, main consultant and plot owner. The permit is valid for 6 months.
Building Modification Permit
- Appointment letter signed by owner, consultant and contractor
- Layout of site mobilisation, if applicable
This is the route for adding structural elements, changing the use or adding GFA, and it is available after the building completion certificate. See fit-out vs building modification.
Shoring and Demolition Permits
Shoring: soil investigation report, appointment letter, geotechnical calculations and model, shoring drawings in Circular 400 format, design review checklist, NOCs where applicable, a neighbour's NOC if anchors enter their plot, and a third-party review for more than 3 basements or projects near water. Preliminary Design Approval comes first. See shoring permits.
Demolition: site setting-out plan, NOCs (DEWA and telecom for mechanical demolition; Civil Defence, Police and RTA added for controlled explosion), hoarding layout, method statement with HSE and emergency plan, a neighbour impact study and site photographs. See demolition permits.
Free Assessment
Get the DDA File Complete First Time
We prepare Circular 400 drawings and the full document set for the right permit. Free scope check in 24 hours.
Frequently Asked Questions
01What documents does a DDA fit-out permit need?
02What documents does a DDA building modification permit need?
03Who applies for DDA permits?
04How long is a DDA fit-out permit valid?