Dubai has three main building authorities, and a project prepared for one is not accepted by another. The differences are practical: which portal, which drawing format, which fees. This comparison sets them side by side, with published figures where the authorities publish them.

Dar Al Naseeb Engineering Consultants

Licensed Engineering Consultants · Dubai, UAE · Est. 2012

AED 0.90/ft²
DDA fit-out permit (min 200, max 10,000)
3 days
DM published time for a new building permit
2 days
DDA published time for a fit-out permit
AED 0.90/ft²
DDA fit-out permit (min 200, max 10,000)
3 days
DM published time for a new building permit
2 days
DDA published time for a fit-out permit
Accreditation
Trakhees requirement for project companies
Trakhees, Dubai Municipality (DM) and the Dubai Development Authority (DDA) all issue building and fit-out permits, but for different areas, through different systems and to different drawing standards. The plot decides which one you deal with. The authorities do not publish equally. DDA publishes fees and service times for each permit; Dubai Municipality publishes some service times; Trakhees publishes little on its public pages. Where a figure is not published, we say so rather than estimate.
Comparison

Published figures are cited; where an authority does not publish one, the table says so.

ItemTrakheesDubai MunicipalityDDA
Typical areasPalm Jumeirah, JAFZA, Nakheel communities such as Al Furjan, Dubai Maritime CityMost mainland plots, e.g. The Springs, Al QuozTECOM zones, Dubai Hills Estate, Arabian Ranches
Online systemonline.trakhees.ae (CED Online Services)Building Permit System (BPS)Zoning e-Services
Fit-out permit feeNot found on public pagesConfirm at applicationAED 0.90/ft², min 200, max 10,000
Published service timeNot found on public pagesNew building permit: 3 working daysFit-out: 2 working days
Who submitsAccredited consultants and contractorsRegistered consultants and contractorsContractor, with consultant drawings
Fit-out permit validityConfirm with TrakheesConfirm at application6 months
01

Why a Drawing for One Is Rejected by Another

Each authority has its own drawing format and submission structure. DDA requires drawings to its Circular 400 format, Dubai Municipality's BPS checks drawing layers against the Dubai Building Code at upload, and Trakhees reviewers routinely reject drawings prepared in DM format.

So confirm the authority before drawings are prepared, not after. See is your property under Trakhees?

02

Developer NOCs Sit in Front of All Three

In master communities, the developer's NOC comes before any of these authorities: Nakheel before Trakhees on Palm Jumeirah, Emaar before Dubai Municipality in The Springs, and Emaar before DDA in Arabian Ranches and Dubai Hills Estate. The developer reviews the design against community guidelines; the authority reviews it against building regulations.

See developer NOC fees compared.

03

Where to Go Next

Free Assessment

Get the Authority Right First

We confirm your plot's authority and prepare drawings in its format from the start. Free check in 24 hours.

Frequently Asked Questions

01What is the difference between Trakhees and Dubai Municipality?
They govern different areas and use different systems and drawing formats. Trakhees covers its zones, such as Palm Jumeirah and JAFZA, through online.trakhees.ae; Dubai Municipality covers most mainland plots through BPS.
02What is the difference between DDA and Dubai Municipality?
DDA governs its own areas, such as TECOM zones and Dubai Hills Estate, through Zoning e-Services and Circular 400 drawings, and publishes per-permit fees. Dubai Municipality covers most mainland plots through BPS.
03Which authority is fastest?
Published times differ by service: DDA publishes 2 working days for a fit-out permit and Dubai Municipality 3 working days for a new building permit. Real timelines depend mostly on a complete, correct submission and on the developer NOC.
04Can I use the same drawings for Trakhees and Dubai Municipality?
No. Each authority has its own drawing format, and drawings prepared for one are routinely rejected by another.

Official Sources

Fees and procedures change without notice. Confirm any figure with the authority before you rely on it.

More Guides