Structural Modification Approval in Dubai
Opening a wall, adding a floor, cutting a slab or adding a mezzanine all change how a building carries load. In Dubai that needs approval from the authority for the plot before work starts, based on a structural design to recognised codes.
Dar Al Naseeb Engineering Consultants
Licensed Engineering Consultants · Dubai, UAE · Est. 2012
What Counts as a Structural Change
- Removing or opening a load-bearing wall, or cutting a new opening in one
- Adding a floor, a roof room or an extension
- New openings in slabs for stairs, lifts or shafts
- Mezzanine floors, including steel mezzanines in warehouses
- New loads on an existing roof or slab: water tanks, plant, solar arrays, pools on upper levels
- Steel structures attached to the building, such as canopies and shades
Non-structural work, such as finishes, joinery and lightweight partitions that carry nothing, follows lighter fit-out or decoration routes. If you are not sure whether a wall is load-bearing, the answer comes from the original approved structural drawings or an engineer's inspection, not from tapping it.
Which Authority, and How Each Handles It
Dubai Municipality. Applications go through the Dubai Building Permit System (BPS), where other authorities review the file and upload their NOCs and DM issues the permit and stamps the drawings. Structural design must follow the codes listed in Administrative Resolution No. 37 of 2021, for example ACI 318 for concrete and AISC 360 for steel.
Dubai Development Authority. Changes to a completed building use DDA's Building Modification Permit, which applies after the Building Completion Certificate. See DDA fit-out vs modification permit.
Trakhees. Trakhees' own procedure (PCFC-TRK-CED-MF-CP-01) requires a Modification Permit from the CED Modification Section for works on buildings that already have a Building Completion Certificate, before construction starts. Its target is 7 working days from payment for a new permit, the permit must be revalidated if works do not start within six months, and the process closes with a Modification Completion Certificate. See Trakhees CED vs EHS.
In developer communities (Emaar, Nakheel, DAMAC and others) the developer's NOC usually comes first.
What the Submission Contains
- Existing drawings, ideally the stamped approved set. Trakhees, for example, has a process to request copies from its document control; if none exist, as-existing drawings are prepared and labelled
- Structural assessment of the existing elements affected
- Proposed structural drawings and calculations, to the codes the authority accepts
- Architectural drawings showing the change in context
- Developer or landlord NOC where applicable
- Contractor details, since structural works need a registered contractor
For steel elements, see steel drawings and calculations.
Inspections and Completion
Structural works are inspected during construction. Trakhees, for example, lists a Modification Structural Inspection in its procedure. At the end, the authority issues a completion certificate for the modification: a Building Completion Certificate in DM, or a Modification Completion Certificate in Trakhees. Keep the approved drawings and completion certificate together; buyers, landlords and future applications will ask for them. See Building Completion Certificates and regularising unapproved works.
Free Assessment
Planning a Structural Change?
Send us the plot, the existing drawings if you have them and what you want to change. We confirm the authority and what the submission needs. Free review in 24 hours.
Frequently Asked Questions
01Do I need approval to remove a wall in Dubai?
02Which codes does Dubai Municipality use for structural design?
03Does a structural change in a Trakhees area need a Modification Permit?
04What if I do not have the original drawings?
Official Sources
Fees and procedures change without notice. Confirm any figure with the authority before you rely on it.